Thanks for posting those pics. Might it be better to make the tool with a c-clamp?





Well been a few day we had a good week where temp was good for priming frame, so I managed to get the belly covered, then called about the head liner which I ordered last month on the 14 th thinking enough lead time to find out the material will not be in till the 28 of this month o well. So today I replaced all the o rings in brake system, installed inspection rings and drains. Trying to figure out if I need the skylight before covering the rest of the plane.